Baku, Azerbaijan
Heydar Aliyev Baku Oil Refinery
حول رقم الطاقة: EIA 2023 gives 120,493 b/cd. OGJ says more than 6 Mt per year and about 6.3 Mt processed in 2023 (equal to about 126,000 bpd, so throughput slightly exceeds the EIA figure). Trend cites 6.5 Mt. Modernisation targets 7.5 Mt; the Euro 5 fuels complex started up in June 2024.
ما ينتجه
بنزين
Diesel and gasoil
عن هذه المصفاة
SOCAR's main refinery in Baku began as the New Baku Oil Refinery in 1953 and was merged with the neighbouring Azerneftyag plant from 2015. A modernisation programme started in 2015, with phase one finished in December 2018 including a bitumen unit raising bitumen output to 400,000 tonnes a year. The target is 7.5 million tonnes a year and Euro-5 fuels.
تشكيلة الخامات: Processes 21 of 24 crude grades per Offshore Technology; mainly Azeri light and other Caspian crude
إمكانية التصدير: Caspian coast at Baku; propane-propylene and butane-butylene fractions are piped to Azerikimya
على الخريطة
المحطات والموانئ القريبة
- Heydar Aliyev Baku Oil Refinery0 km · Refinery tank farm
- Sangachal Terminal44 km · Export terminal
- Baku Oil Terminal (Azertrans)63 km · Port and anchorage
مصافٍ أخرى في Azerbaijan
موقع المشغّلاطلب منتجات من هذه المنطقة
إدراج كيان هنا ليس تزكية، ولا يعني أنه يمكن التعامل معه قانونيا. كثير من الكيانات في إيران وروسيا وسوريا وفنزويلا ودول أخرى خاضع للعقوبات. افحص كل طرف قبل أي تواصل.
المصادر
- Offshore Technology, Heydar Aliyev Oil Refinery
- OGJ, SOCAR commissions unit, wraps Phase 1
- EIA Caspian Sea regional analysis
- OGJ: Baku refinery starts up fuels plant
كُتب بأسلوب PST من المصادر أعلاه. الثقة في البيانات: medium. أبلغ مكتب PST بأي تصحيح.