← كل المصافي
Ruwais, Abu Dhabi, United Arab Emirates
Ruwais Carbon Black and Delayed Coker Plant
طاقة تقطير الخامغير منشور
بدأ2018
درجة التعقيدcomplex (deep conversion)
المالكADNOC (via ADNOC Refining)
حول رقم الطاقة: Wikipedia gives 430,000 t/yr of anode-grade calcined coke and 40,600 t/yr of carbon black; not expressed in bpd.
ما ينتجه
Petroleum coke
عن هذه المصفاة
A residue upgrading plant at Ruwais that cokes heavy residue and makes calcined coke and carbon black. It opened in 2018 and was built to add value to the heaviest refinery streams.
تشكيلة الخامات: Residue from the Ruwais West cracker
على الخريطة
23 على الخريطة
المحطات والموانئ القريبة
- Jebel Dhanna / Ruwais (ADNOC)15 km · Refinery tank farm
- Zirku Island terminal (ADNOC)92 km · Export terminal
- Habshan crude pumping and storage hub (ADNOC Onshore)96 km · Export terminal
- Das Island oil export terminal117 km · Export terminal
- Hamad Port152 km · Port and anchorage
- Mesaieed terminal and port154 km · Port and anchorage
مصافٍ أخرى في United Arab Emirates
- Ruwais Refinery922,000 bpd
- Ruwais Refinery Expansion (proposed 600,000 bpd)600,000 bpd
- Jebel Ali Refinery210,000 bpd
- VTTI Fujairah Refinery (Fujairah Refinery Limited)200,000 bpd
- Brooge Fujairah Refinery (proposed)180,000 bpd
- Umm Al Nar Refinery (Abu Dhabi Refinery)74,000 bpd
- Fort Energy Fujairah Refinery (former Uniper)67,000 bpd
- BPGIC and Sahara Fujairah Topping Refinery25,000 bpd
موقع المشغّلاطلب منتجات من هذه المنطقة
إدراج كيان هنا ليس تزكية، ولا يعني أنه يمكن التعامل معه قانونيا. كثير من الكيانات في إيران وروسيا وسوريا وفنزويلا ودول أخرى خاضع للعقوبات. افحص كل طرف قبل أي تواصل.
المصادر
كُتب بأسلوب PST من المصادر أعلاه. الثقة في البيانات: low. أبلغ مكتب PST بأي تصحيح.
