انتقل إلى المحتوى
تسجيل الدخولاطلب عرضاً

← كل المحطات

ADNOC Fujairah crude terminal and Habshan-Fujairah pipeline end point

Fujairah, United Arab Emirates · Export terminal

التخزين
Not published
الحالة
operating
المشغّل
ADNOC (via Abu Dhabi Crude Oil Pipeline)
المالك
Mubadala Investment Company listed as pipeline owner
الملكية
state
بدأ
2012
الخزانات
Above-ground tanks at the pipeline terminal built by Belleli Energy; count not stated.
الأرصفة
Mooring system supplied by Bluewater Energy Services; tanks built by Belleli Energy (Wikipedia).
الربط
Habshan-Fujairah pipeline: 406 km, 48 inch, 1.5 million bpd, built 2008 to 2011, operational June 2012. ADNOC announced in May 2026 a parallel West-East 1 line to double export capacity by 2027.

حول رقم الطاقة: No terminal storage is stated. Reports in search summaries describe planned ADNOC underground caverns of three times 14 million barrels at Fujairah; completion not confirmed.

عن هذا الموقع

End point of the Habshan-Fujairah pipeline, with tanks and a mooring system at Fujairah that let Abu Dhabi crude be exported outside the Strait of Hormuz. The pipeline carries up to 1.5 million bpd.

المنتجات التي تتم مناولتها

  • خام

موقعه

12482
31 على الخريطة

بيانات التواصل

الموقع الإلكتروني
adnoc.ae

بيانات التواصل هي جهات اتصال مؤسسية كما نشرتها الشركة أو دليل عام، وهي تتغير. تحقق منها قبل الاعتماد عليها، ولا ترسل أموالاً أبداً إلى رقم أو حساب لم تتأكد منه بنفسك.

مواقع أخرى في United Arab Emirates

إدراج كيان هنا ليس تزكية، ولا يعني أنه يمكن التعامل معه قانونيا. كثير من الكيانات في إيران وروسيا وسوريا وفنزويلا ودول أخرى خاضع للعقوبات. افحص كل طرف قبل أي تواصل.

المصادر

كُتب بأسلوب PST من المصادر أعلاه. الثقة في البيانات: medium. أبلغ مكتب PST بأي تصحيح.