Duqm, Oman
Duqm Refinery
About the capacity figure: Wikipedia gives 230,000 bpd. Status note: Commercial operation began in February 2024 (Attaqa). OQ8 expected throughput near 255,000 bpd in 2026, about 110 percent of design, and has flagged a naphtha reformer as the next step. A second-phase petrochemicals plant is mentioned in older MEED coverage and is unconfirmed. (from public reports, not confirmed by the operator)
What it makes
LPG
Naphtha
Jet fuel and kerosene
Diesel and gasoil
Sulphur
Petroleum coke
About this refinery
A 50:50 joint venture between OQ and Kuwait Petroleum International, built around a hydrocracker and a petroleum coke unit. Crude unit trials began in April 2023 and the government inaugurated it in early 2024. A 25,000 bpd debottlenecking was reported for 2025.
Crude slate: Crude stored at Ras Markaz and piped about 80 km to the refinery
Export access: Port of Duqm
On the map
Terminals and ports nearby
- Duqm Refinery (OQ8) tank farm0 km · Refinery tank farm
- Port of Duqm liquid bulk terminal8 km · Port and anchorage
- Duqm Fisheries Port bunkering station8 km · Bunkering hub
- Ras Markaz Crude Oil Terminal27 km · Storage terminal (commercial)
Other refineries in Oman
- Sohar Refinery198,000 bpd
- Mina Al Fahal Refinery106,000 bpd
- Sohar Asphalt Bitumen Refinery30,000 bpd
- Aromatics Oman Complex (Sohar)Not published
Operator websiteRequest products from this region
Listing an entity here is not an endorsement and does not mean it can be dealt with lawfully. Many entities in Iran, Russia, Syria, Venezuela and other countries are subject to sanctions. Screen every party before any contact.
Sources
- Enerdata: Duqm refinery inaugurated
- Wikipedia: Duqm Refinery
- OQ8: official site
- Attaqa: Duqm refinery report (Arabic)
Written in PST's own words from the sources above. Confidence in the data: medium. Report a correction to the PST desk.
