Skip to content

← All terminals

Jask oil terminal

Jask, Hormozgan Province, Iran · Export terminal

Storage
635,948 m³
Status
operating
Operator
NIOC / PEDEC project
Owner
NIOC (build-operate-transfer over 18 years)
Ownership
state
Started
2024
Tanks
20 floating-roof tanks of 500,000 barrels planned.
Berths
Three single point moorings planned; vessel limits not stated.
Connections
Goreh-Jask pipeline 1,100 km, 46 in, design 1 million bpd.

About the capacity figure: Eight 500,000 barrel crude tanks (4 million barrels, about 636,000 cbm) reported ready in 2024 versus a 10 million barrel phase 1 design; Washington Institute lists 30 million barrels planned in phases. Loading is below design.

About this site

Gulf of Oman export terminal intended to reduce dependence on Hormuz. Reports indicate actual loading is well below design.

Products handled

  • crude

Where it is

24322
27 on the map

Contact details

No corporate contact is published that PST could confirm. PST can find the right person for you.

Contact details are corporate contacts as published by the company or a public directory. They change. Check them before you rely on them, and never send money to a number or account you have not confirmed yourself.

Other sites in Iran

Listing an entity here is not an endorsement and does not mean it can be dealt with lawfully. Many entities in Iran, Russia, Syria, Venezuela and other countries are subject to sanctions. Screen every party before any contact.

Sources

Written in PST's own words from the sources above. Confidence in the data: low. Report a correction to the PST desk.