Skip to content

← All terminals

SUMED Sidi Kerir Terminal

Sidi Kerir, west of Alexandria, Egypt · Export terminal

Storage
3.1 million m³
Status
operating
Operator
Arab Petroleum Pipelines Company (SUMED)
Owner
EGPC, Saudi Aramco, ADNOC-linked and Kuwaiti partners
Ownership
joint venture
Started
1977
Tanks
Floating roof tanks; counts of 24 to 30 reported.
Connections
SUMED pipelines from Ain Sukhna; feeds Mediterranean tankers and Alexandria refineries.

About the capacity figure: About 19.5 million barrels (Kpler-based), converted; older reports give 3.1 to 3.3 million m3.

About this site

Mediterranean end of SUMED and a major crude storage and loading hub; loadings rose sharply amid Hormuz and Red Sea disruption in 2026.

Products handled

  • crude

Where it is

3
6 on the map

Contact details

Website
sumed.org

Contact details are corporate contacts as published by the company or a public directory. They change. Check them before you rely on them, and never send money to a number or account you have not confirmed yourself.

Other sites in Egypt

Listing an entity here is not an endorsement and does not mean it can be dealt with lawfully. Many entities in Iran, Russia, Syria, Venezuela and other countries are subject to sanctions. Screen every party before any contact.

Sources

Written in PST's own words from the sources above. Confidence in the data: medium. Report a correction to the PST desk.