Baku, Azerbaijan
Heydar Aliyev Baku Oil Refinery
Sobre la cifra de capacidad: EIA 2023 gives 120,493 b/cd. OGJ says more than 6 Mt per year and about 6.3 Mt processed in 2023 (equal to about 126,000 bpd, so throughput slightly exceeds the EIA figure). Trend cites 6.5 Mt. Modernisation targets 7.5 Mt; the Euro 5 fuels complex started up in June 2024.
Qué produce
Gasolina
Diesel and gasoil
Sobre esta refinería
SOCAR's main refinery in Baku began as the New Baku Oil Refinery in 1953 and was merged with the neighbouring Azerneftyag plant from 2015. A modernisation programme started in 2015, with phase one finished in December 2018 including a bitumen unit raising bitumen output to 400,000 tonnes a year. The target is 7.5 million tonnes a year and Euro-5 fuels.
Mezcla de crudos: Processes 21 of 24 crude grades per Offshore Technology; mainly Azeri light and other Caspian crude
Acceso de exportación: Caspian coast at Baku; propane-propylene and butane-butylene fractions are piped to Azerikimya
En el mapa
Terminales y puertos cercanos
- Heydar Aliyev Baku Oil Refinery0 km · Refinery tank farm
- Sangachal Terminal44 km · Export terminal
- Baku Oil Terminal (Azertrans)63 km · Port and anchorage
Otras refinerías en Azerbaijan
Sitio web del operadorSolicitar productos de esta región
Figurar aquí no es un aval ni significa que se pueda tratar con la entidad de forma lícita. Muchas entidades de Irán, Rusia, Siria, Venezuela y otros países están sujetas a sanciones. Filtre a todas las partes antes de cualquier contacto.
Fuentes
- Offshore Technology, Heydar Aliyev Oil Refinery
- OGJ, SOCAR commissions unit, wraps Phase 1
- EIA Caspian Sea regional analysis
- OGJ: Baku refinery starts up fuels plant
Redactado con palabras propias de PST a partir de las fuentes anteriores. Fiabilidad de los datos: medium. Comunique una corrección a la mesa de PST.