Jazan (Jizan Economic City), Saudi Arabia
Jazan Refinery
Sobre la cifra de capacidad: Design capacity 400,000 bpd (Aramco magazine and Wikipedia). Aramco reported test runs from January 2021 and about half capacity by October 2021 (MEED via search summary). Nota de estado: Aramco shut the refinery on 27 July 2026 after a Houthi drone attack that damaged the gasification complex and a tank area; restart was pushed from 15 August to about 30 August and further attacks followed. Restart not confirmed in the sources found. (según informes públicos, sin confirmar por el operador)
Qué produce
GLP
Gasolina
Diesel and gasoil
Aromáticos
Azufre
Betún
Sobre esta refinería
Jazan is a 400,000 barrel per day Aramco refinery on the Red Sea, with an associated gasification and power complex. Reports say it was shut on 27 July 2026 after a Houthi attack, with a restart targeted for late August 2026. Current status after that is unconfirmed.
Mezcla de crudos: Heavy and medium Arabian crude
Acceso de exportación: Red Sea coast near Jizan
En el mapa
Terminales y puertos cercanos
- Aramco Jizan loading facility (bulk plant)1 km · Storage terminal (commercial)
- Jazan Port1 km · Port and anchorage
- Jazan refinery marine terminal48 km · Refinery tank farm
- Aramco Abha loading facility (bulk plant)148 km · Storage terminal (commercial)
- Aramco Najran loading facility (bulk plant)180 km · Storage terminal (commercial)
- Ras Isa marine terminal199 km · Export terminal
Otras refinerías en Saudi Arabia
- Ras Tanura Refinery550,000 bpd
- SATORP Jubail Refinery465,000 bpd
- SAMREF Yanbu Refinery400,000 bpd
- YASREF Yanbu Refinery400,000 bpd
- Petro Rabigh Refinery400,000 bpd
- SASREF (Saudi Aramco Shell Refinery) Jubail305,000 bpd
- Yanbu Refinery (Aramco)235,000 bpd
- Riyadh Refinery126,000 bpd
Sitio web del operadorSolicitar productos de esta región
Figurar aquí no es un aval ni significa que se pueda tratar con la entidad de forma lícita. Muchas entidades de Irán, Rusia, Siria, Venezuela y otros países están sujetas a sanciones. Filtre a todas las partes antes de cualquier contacto.
Fuentes
- Wikipedia: Jazan Refinery
- Aramco Elements: Jazan complex
- The National: Fire at Jazan refinery brought under control
- Hydrocarbon Processing: Aramco delays Jazan restart to August 30
- World Oil: Saudi Arabia halts energy operations after Houthi attacks
Redactado con palabras propias de PST a partir de las fuentes anteriores. Fiabilidad de los datos: medium. Comunique una corrección a la mesa de PST.
