Habshan, Abu Dhabi, United Arab Emirates
Habshan Gas Processing Complex
دربارهٔ عدد ظرفیت: ADNOC Gas describes 5 plants and 14 trains with 6.1 bscfd of gas capacity; not a crude refinery, so no bpd figure.
چه چیزی تولید میکند
LPG
Condensate products
گوگرد
دربارهٔ این پالایشگاه
A very large onshore gas processing complex in Abu Dhabi that strips NGLs and sulphur from associated gas. The NGLs are sent on to Ruwais for fractionation. Included for completeness as a hydrocarbon processing plant, not a refinery.
روی نقشه
ترمینالها و بنادر نزدیک
- Habshan crude pumping and storage hub (ADNOC Onshore)0 km · Export terminal
- Jebel Dhanna / Ruwais (ADNOC)110 km · Refinery tank farm
- Zirku Island terminal (ADNOC)129 km · Export terminal
- Arabian Chemical Terminals Abu Dhabi (ACTAD)150 km · Storage terminal (commercial)
- Oylz Terminals Khalifa Port petroleum terminal150 km · Storage terminal (commercial)
- Das Island oil export terminal165 km · Export terminal
پالایشگاههای دیگر در United Arab Emirates
- Ruwais Refinery922,000 bpd
- Ruwais Refinery Expansion (proposed 600,000 bpd)600,000 bpd
- Jebel Ali Refinery210,000 bpd
- VTTI Fujairah Refinery (Fujairah Refinery Limited)200,000 bpd
- Brooge Fujairah Refinery (proposed)180,000 bpd
- Umm Al Nar Refinery (Abu Dhabi Refinery)74,000 bpd
- Fort Energy Fujairah Refinery (former Uniper)67,000 bpd
- BPGIC and Sahara Fujairah Topping Refinery25,000 bpd
وبسایت بهرهبرداردرخواست محصول از این منطقه
فهرستشدن یک نهاد در اینجا تأیید آن نیست و به معنای امکان معامله قانونی با آن نیست. بسیاری از نهادها در ایران، روسیه، سوریه، ونزوئلا و کشورهای دیگر مشمول تحریم هستند. پیش از هر تماس، همه طرفها را غربالگری کنید.
منابع
با بیان خود PST و بر پایهٔ منابع بالا نوشته شده است. اطمینان از داده: low. اصلاحیه را به میز PST گزارش دهید.
