Baku, Azerbaijan
Heydar Aliyev Baku Oil Refinery
دربارهٔ عدد ظرفیت: EIA 2023 gives 120,493 b/cd. OGJ says more than 6 Mt per year and about 6.3 Mt processed in 2023 (equal to about 126,000 bpd, so throughput slightly exceeds the EIA figure). Trend cites 6.5 Mt. Modernisation targets 7.5 Mt; the Euro 5 fuels complex started up in June 2024.
چه چیزی تولید میکند
بنزین
Diesel and gasoil
دربارهٔ این پالایشگاه
SOCAR's main refinery in Baku began as the New Baku Oil Refinery in 1953 and was merged with the neighbouring Azerneftyag plant from 2015. A modernisation programme started in 2015, with phase one finished in December 2018 including a bitumen unit raising bitumen output to 400,000 tonnes a year. The target is 7.5 million tonnes a year and Euro-5 fuels.
سبد نفت خام: Processes 21 of 24 crude grades per Offshore Technology; mainly Azeri light and other Caspian crude
دسترسی به صادرات: Caspian coast at Baku; propane-propylene and butane-butylene fractions are piped to Azerikimya
روی نقشه
ترمینالها و بنادر نزدیک
- Heydar Aliyev Baku Oil Refinery0 km · Refinery tank farm
- Sangachal Terminal44 km · Export terminal
- Baku Oil Terminal (Azertrans)63 km · Port and anchorage
پالایشگاههای دیگر در Azerbaijan
وبسایت بهرهبرداردرخواست محصول از این منطقه
فهرستشدن یک نهاد در اینجا تأیید آن نیست و به معنای امکان معامله قانونی با آن نیست. بسیاری از نهادها در ایران، روسیه، سوریه، ونزوئلا و کشورهای دیگر مشمول تحریم هستند. پیش از هر تماس، همه طرفها را غربالگری کنید.
منابع
- Offshore Technology, Heydar Aliyev Oil Refinery
- OGJ, SOCAR commissions unit, wraps Phase 1
- EIA Caspian Sea regional analysis
- OGJ: Baku refinery starts up fuels plant
با بیان خود PST و بر پایهٔ منابع بالا نوشته شده است. اطمینان از داده: medium. اصلاحیه را به میز PST گزارش دهید.