Aktau, Kazakhstan
Caspi Bitum Plant
क्षमता के आँकड़े के बारे में: Orda.kz reports an upgrade that lifted refining from 1.0 to 1.5 Mt per year (about 30,000 bpd) and bitumen from 500,000 to 750,000 t, with a restart on 5 May 2025. KMG annual report 2024 still shows 1.0 Mt design and 327 kt throughput, and says the upgrade targets 1.5 Mt and 700 kt of road bitumen.
यह क्या बनाता है
बिटुमेन
इस रिफ़ाइनरी के बारे में
Caspi Bitum is a bitumen refinery at Aktau, a joint venture of KazMunayGas and CITIC. It started in December 2013 and was expanded to 1.5 million tonnes of oil a year and 750,000 tonnes of bitumen a year, with a relaunch reported in May 2025. It is described as the largest road bitumen producer in Central Asia.
क्रूड स्लेट: Karazhanbas field crude (Orda.kz).
एक्सपोर्ट एक्सेस: Aimed at the domestic road market; no export routes stated.
नक़्शे पर
आसपास के टर्मिनल और पोर्ट
Kazakhstan की अन्य रिफ़ाइनरियाँ
- Planned fourth Kazakh refinery200,000 bpd
- Pavlodar Refinery (Pavlodar Petrochemical Plant)120,000 bpd
- Shymkent Refinery (PetroKazakhstan Oil Products)120,000 bpd
- Atyrau Refinery110,000 bpd
- Shymkent Refinery Expansion (12 Mt per year project)Not published
- Kazakhstan Petrochemical Industries gas chemical complexNot published
- Karachaganak Gas Processing PlantNot published
ऑपरेटर की वेबसाइटइस क्षेत्र से उत्पाद माँगें
यहाँ किसी संस्था का नाम होना समर्थन नहीं है और इसका अर्थ यह नहीं कि उससे वैध रूप से व्यवहार किया जा सकता है। ईरान, रूस, सीरिया, वेनेज़ुएला और अन्य देशों की कई संस्थाएँ प्रतिबंधों के अधीन हैं। किसी भी संपर्क से पहले हर पक्ष की जाँच करें।
स्रोत
- KMG Annual Report 2023, Downstream review
- Caspi Bitum plant restarts after modernization (Orda)
- KMG Annual Report 2024, downstream
ऊपर दिए स्रोतों के आधार पर PST के अपने शब्दों में लिखा गया। डेटा की विश्वसनीयता: medium। सुधार की सूचना PST डेस्क को दें।