Baku, Azerbaijan
Heydar Aliyev Baku Oil Refinery
Sul dato di capacità: EIA 2023 gives 120,493 b/cd. OGJ says more than 6 Mt per year and about 6.3 Mt processed in 2023 (equal to about 126,000 bpd, so throughput slightly exceeds the EIA figure). Trend cites 6.5 Mt. Modernisation targets 7.5 Mt; the Euro 5 fuels complex started up in June 2024.
Cosa produce
Benzina
Diesel and gasoil
Su questa raffineria
SOCAR's main refinery in Baku began as the New Baku Oil Refinery in 1953 and was merged with the neighbouring Azerneftyag plant from 2015. A modernisation programme started in 2015, with phase one finished in December 2018 including a bitumen unit raising bitumen output to 400,000 tonnes a year. The target is 7.5 million tonnes a year and Euro-5 fuels.
Paniere di greggi: Processes 21 of 24 crude grades per Offshore Technology; mainly Azeri light and other Caspian crude
Accesso all'esportazione: Caspian coast at Baku; propane-propylene and butane-butylene fractions are piped to Azerikimya
Sulla mappa
Terminal e porti vicini
- Heydar Aliyev Baku Oil Refinery0 km · Refinery tank farm
- Sangachal Terminal44 km · Export terminal
- Baku Oil Terminal (Azertrans)63 km · Port and anchorage
Altre raffinerie nel Paese: Azerbaijan
Sito web dell'operatoreRichiedere prodotti da questa regione
L'inclusione di un soggetto qui non è un'approvazione e non significa che si possa operare con esso legalmente. Molti soggetti in Iran, Russia, Siria, Venezuela e altri paesi sono soggetti a sanzioni. Verificate ogni parte prima di qualsiasi contatto.
Fonti
- Offshore Technology, Heydar Aliyev Oil Refinery
- OGJ, SOCAR commissions unit, wraps Phase 1
- EIA Caspian Sea regional analysis
- OGJ: Baku refinery starts up fuels plant
Redatto con parole proprie di PST a partire dalle fonti sopra. Affidabilità dei dati: medium. Per segnalare una correzione, si rivolga al desk PST.