Passare al contenuto

← Tutti i terminal

Jask oil terminal

Jask, Hormozgan Province, Iran · Export terminal

Stoccaggio
635,948 m³
Stato
operating
Operatore
NIOC / PEDEC project
Armatore
NIOC (build-operate-transfer over 18 years)
Proprietà
state
Avviato
2024
Serbatoi
20 floating-roof tanks of 500,000 barrels planned.
Banchine
Three single point moorings planned; vessel limits not stated.
Collegamenti
Goreh-Jask pipeline 1,100 km, 46 in, design 1 million bpd.

Sul dato di capacità: Eight 500,000 barrel crude tanks (4 million barrels, about 636,000 cbm) reported ready in 2024 versus a 10 million barrel phase 1 design; Washington Institute lists 30 million barrels planned in phases. Loading is below design.

Su questo sito

Gulf of Oman export terminal intended to reduce dependence on Hormuz. Reports indicate actual loading is well below design.

Prodotti movimentati

  • greggio

Dove si trova

24322
27 sulla mappa

Recapiti

Non risulta alcun contatto aziendale pubblicato che PST abbia potuto confermare. PST può individuare per Lei la persona giusta.

I recapiti sono contatti aziendali così come pubblicati dalla società o da un elenco pubblico. Cambiano nel tempo. Li verifichi prima di farvi affidamento e non invii mai denaro a un numero o a un conto che non abbia confermato personalmente.

Altri siti nel Paese: Iran

L'inclusione di un soggetto qui non è un'approvazione e non significa che si possa operare con esso legalmente. Molti soggetti in Iran, Russia, Siria, Venezuela e altri paesi sono soggetti a sanzioni. Verificate ogni parte prima di qualsiasi contatto.

Fonti

Redatto con parole proprie di PST a partire dalle fonti sopra. Affidabilità dei dati: low. Per segnalare una correzione, si rivolga al desk PST.