Jazan (Jizan Economic City), Saudi Arabia
Jazan Refinery
Sobre o dado de capacidade: Design capacity 400,000 bpd (Aramco magazine and Wikipedia). Aramco reported test runs from January 2021 and about half capacity by October 2021 (MEED via search summary). Observação de situação: Aramco shut the refinery on 27 July 2026 after a Houthi drone attack that damaged the gasification complex and a tank area; restart was pushed from 15 August to about 30 August and further attacks followed. Restart not confirmed in the sources found. (de relatórios públicos, não confirmado pelo operador)
O que produz
GLP
Gasolina
Diesel and gasoil
Aromáticos
Enxofre
Asfalto
Sobre esta refinaria
Jazan is a 400,000 barrel per day Aramco refinery on the Red Sea, with an associated gasification and power complex. Reports say it was shut on 27 July 2026 after a Houthi attack, with a restart targeted for late August 2026. Current status after that is unconfirmed.
Cesta de petróleos: Heavy and medium Arabian crude
Acesso de exportação: Red Sea coast near Jizan
No mapa
Terminais e portos próximos
- Aramco Jizan loading facility (bulk plant)1 km · Storage terminal (commercial)
- Jazan Port1 km · Port and anchorage
- Jazan refinery marine terminal48 km · Refinery tank farm
- Aramco Abha loading facility (bulk plant)148 km · Storage terminal (commercial)
- Aramco Najran loading facility (bulk plant)180 km · Storage terminal (commercial)
- Ras Isa marine terminal199 km · Export terminal
Outras refinarias em Saudi Arabia
- Ras Tanura Refinery550,000 bpd
- SATORP Jubail Refinery465,000 bpd
- SAMREF Yanbu Refinery400,000 bpd
- YASREF Yanbu Refinery400,000 bpd
- Petro Rabigh Refinery400,000 bpd
- SASREF (Saudi Aramco Shell Refinery) Jubail305,000 bpd
- Yanbu Refinery (Aramco)235,000 bpd
- Riyadh Refinery126,000 bpd
Site do operadorSolicitar produtos desta região
Constar aqui não é um aval e não significa que se possa negociar legalmente com a entidade. Muitas entidades no Irão, Rússia, Síria, Venezuela e outros países estão sujeitas a sanções. Faça a triagem de todas as partes antes de qualquer contacto.
Fontes
- Wikipedia: Jazan Refinery
- Aramco Elements: Jazan complex
- The National: Fire at Jazan refinery brought under control
- Hydrocarbon Processing: Aramco delays Jazan restart to August 30
- World Oil: Saudi Arabia halts energy operations after Houthi attacks
Redigido com as palavras da própria PST a partir das fontes acima. Confiabilidade dos dados: medium. Informe uma correção à mesa da PST.