Baku, Azerbaijan
Heydar Aliyev Baku Oil Refinery
关于产能数据: EIA 2023 gives 120,493 b/cd. OGJ says more than 6 Mt per year and about 6.3 Mt processed in 2023 (equal to about 126,000 bpd, so throughput slightly exceeds the EIA figure). Trend cites 6.5 Mt. Modernisation targets 7.5 Mt; the Euro 5 fuels complex started up in June 2024.
产出
汽油
Diesel and gasoil
关于本炼厂
SOCAR's main refinery in Baku began as the New Baku Oil Refinery in 1953 and was merged with the neighbouring Azerneftyag plant from 2015. A modernisation programme started in 2015, with phase one finished in December 2018 including a bitumen unit raising bitumen output to 400,000 tonnes a year. The target is 7.5 million tonnes a year and Euro-5 fuels.
原油配比: Processes 21 of 24 crude grades per Offshore Technology; mainly Azeri light and other Caspian crude
导出权限: Caspian coast at Baku; propane-propylene and butane-butylene fractions are piped to Azerikimya
在地图上
附近的码头和港口
- Heydar Aliyev Baku Oil Refinery0 km · Refinery tank farm
- Sangachal Terminal44 km · Export terminal
- Baku Oil Terminal (Azertrans)63 km · Port and anchorage
Azerbaijan 的其他炼厂
此处列出的实体不代表背书,也不意味着可以合法与其交易。伊朗、俄罗斯、叙利亚、委内瑞拉和其他国家的许多实体受到制裁。在任何接触之前,请对每一方进行筛查。
来源
- Offshore Technology, Heydar Aliyev Oil Refinery
- OGJ, SOCAR commissions unit, wraps Phase 1
- EIA Caspian Sea regional analysis
- OGJ: Baku refinery starts up fuels plant
由 PST 依据上述来源自行撰写。数据可信度:medium。如有更正,请告知 PST 交易台。