Jazan (Jizan Economic City), Saudi Arabia
Jazan Refinery
关于产能数据: Design capacity 400,000 bpd (Aramco magazine and Wikipedia). Aramco reported test runs from January 2021 and about half capacity by October 2021 (MEED via search summary). 状态说明: Aramco shut the refinery on 27 July 2026 after a Houthi drone attack that damaged the gasification complex and a tank area; restart was pushed from 15 August to about 30 August and further attacks followed. Restart not confirmed in the sources found. (来自公开报告,未经运营方确认)
产出
LPG
汽油
Diesel and gasoil
芳烃
硫
沥青
关于本炼厂
Jazan is a 400,000 barrel per day Aramco refinery on the Red Sea, with an associated gasification and power complex. Reports say it was shut on 27 July 2026 after a Houthi attack, with a restart targeted for late August 2026. Current status after that is unconfirmed.
原油配比: Heavy and medium Arabian crude
导出权限: Red Sea coast near Jizan
在地图上
附近的码头和港口
- Aramco Jizan loading facility (bulk plant)1 km · Storage terminal (commercial)
- Jazan Port1 km · Port and anchorage
- Jazan refinery marine terminal48 km · Refinery tank farm
- Aramco Abha loading facility (bulk plant)148 km · Storage terminal (commercial)
- Aramco Najran loading facility (bulk plant)180 km · Storage terminal (commercial)
- Ras Isa marine terminal199 km · Export terminal
Saudi Arabia 的其他炼厂
- Ras Tanura Refinery550,000 bpd
- SATORP Jubail Refinery465,000 bpd
- SAMREF Yanbu Refinery400,000 bpd
- YASREF Yanbu Refinery400,000 bpd
- Petro Rabigh Refinery400,000 bpd
- SASREF (Saudi Aramco Shell Refinery) Jubail305,000 bpd
- Yanbu Refinery (Aramco)235,000 bpd
- Riyadh Refinery126,000 bpd
此处列出的实体不代表背书,也不意味着可以合法与其交易。伊朗、俄罗斯、叙利亚、委内瑞拉和其他国家的许多实体受到制裁。在任何接触之前,请对每一方进行筛查。
来源
- Wikipedia: Jazan Refinery
- Aramco Elements: Jazan complex
- The National: Fire at Jazan refinery brought under control
- Hydrocarbon Processing: Aramco delays Jazan restart to August 30
- World Oil: Saudi Arabia halts energy operations after Houthi attacks
由 PST 依据上述来源自行撰写。数据可信度:medium。如有更正,请告知 PST 交易台。
